Planning an office refurbishment in Helsinki or Tampere starts with a clear brief, not a list of finishes. International property owners and asset managers need to understand the existing premises, the intended use and the division of responsibilities before comparing contractors. This guide sets out practical questions for preparing an office renovation or commercial fit-out in Uusimaa and Pirkanmaa.

1. Define what the refurbished office needs to achieve
Explain why the premises are changing. A new tenant may need a different layout, an occupier may be consolidating teams, or a property owner may be preparing space for a new use. Describe the expected users, meeting areas, shared facilities and operational requirements. Separate essential outcomes from preferences that can be evaluated during design.
Identify who can approve the brief: the owner, tenant, asset manager or another authorised representative. If several parties are involved, agree how their requirements will be consolidated. Clear approval responsibilities help avoid conflicting instructions during an office fit-out.
2. Gather drawings and identify uncertainties
Collect available floor plans, previous alteration drawings, building-services information and relevant condition surveys. State which documents are current and which need checking. A floor area or a photograph alone does not establish the condition of concealed structures or the capacity of technical systems.
Changes to room layouts or use may affect ventilation, electrical installations, acoustics, accessibility and other design requirements. Ask the relevant designers to assess the proposed changes. Any need for permits or additional investigations should be established for the specific project; it should not be assumed from the description ”office refurbishment” alone.
3. Agree the scope and delivery model
Distinguish construction work from design responsibility. Define who prepares and coordinates the designs, who handles authority matters and which purchases remain with the owner or tenant. Furniture, specialist equipment, IT installations and access-control systems can create interfaces between separate suppliers.
In Finland, KVR refers to a design-and-build delivery model. It is not a synonym for every main-contracting assignment. Discuss whether a main contract, a project-management arrangement or KVR design-and-build fits the available information and the intended responsibilities. The agreed contract, not a general marketing label, defines the contractor’s obligations.
4. Plan around tenants and building operations
If part of the building will remain occupied, identify access routes, deliveries, working hours and areas that must stay available. Discuss dust and noise controls, temporary arrangements and possible interruptions to building services. These constraints can influence sequencing, procurement and the practicality of a target completion date.
For an office renovation in Helsinki, Vantaa or elsewhere in Uusimaa, the individual property’s access and operating conditions need to be assessed. The same applies to office refurbishment in Tampere and the wider Pirkanmaa region. Geography helps identify the service area; it does not replace a site-specific plan.
5. Compare offers on the same basis
Provide the same brief and document versions to the contractors whose offers you compare. Review inclusions, exclusions, assumptions, provisional items and proposed schedules alongside the price. Identify open decisions and ask how they affect the offer. A lower total may reflect a different scope rather than a more economical solution.
Before work begins, agree how unforeseen findings and requested changes will be recorded, priced and approved. For overseas stakeholders, also agree the working language, reporting format, decision-makers and meeting arrangements. Do not assume that every supplier provides the same documentation or communication service.
6. Use relevant project references
Look for comparable building use, technical interfaces and delivery responsibilities, not just a familiar client name. Kymppirakenne’s published examples include City Center Liidio in Helsinki, Paciuksenkatu 21 in Helsinki and the Keilalahti conference centre in Espoo. Each reference has its own project information; their scopes should not be treated as interchangeable.
For an overview of the company and its services, see our separate English introduction to Kymppirakenne. This guide focuses on preparing a refurbishment brief rather than repeating that company presentation.
A practical checklist for your project enquiry
- Location, approximate area and current use of the premises.
- Reason for the refurbishment and intended use after completion.
- Available drawings, surveys and the current design stage.
- Tenant occupancy, access restrictions and permitted service interruptions.
- Target dates, known dependencies and decisions still to be made.
- Proposed contract scope, separate suppliers and approval responsibilities.
Kymppirakenne undertakes renovation and refurbishment projects for professional clients in Uusimaa and Pirkanmaa. Send the initial information through the project enquiry page so that the team can assess the project and the information needed for further discussion. Agree a suitable transfer method before sending confidential project material. The linked service, reference and enquiry pages are in Finnish.